21st May 2003
Spoke to Mike Roe regarding the WGS application. He says it will be difficult to get approval for Cat1a roads as the work exceeds the grant limit, and its not considered necessary. He suggested single tracks with hardcore covering. They need a fairly detailed plan, but there is some leaway in actual positioning.

0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home